The process of installing road signs is carried out in such a way as to be visible and perfectly perceived by all participants in the traffic movement. In no case should they be closed by such items as hinged advertising, supports for external lighting. Only in this way it is possible to ensure the convenience and comfort of operation, as well as to maximize the likelihood of damage to them.
In those sections of the road where the marking due to precipitation or dirt cannot perform its main functions associated with determining the movement mode, the indicators corresponding to the content must be established.
There are temporary funds designed to organize movement. They are mounted in the process of road repair or seasonal features in road conditions. But after all work, they must be dismantled without fail. Some of them are permissible to close with special covers. Such devices include fencing columns made of polymer, various polymer nets can also be applicable. All of them are brightly painted, and in addition, covered on top with a special reflective film.
Continuing the topic of informants, it is worth noting that there is a special sequence of road signs, which should be observed in cases where they are installed on one support. So, order:
– priority;
– warning;
– prescribing;
– special requirements;
– prohibiting;
– informational;
– Service.
As for the distribution of these informants, they affect not only the roadway, but also the side of the road, but also not pedestrian and bicycle paths. An important requirement is the distance of perception and visibility of such devices, at least 100 meters.
Speaking of the location, it must be said that the installation process is carried out on the right side of the road, also over it. If some non -standard situations for which their own requirements should be provided for.
If you duplicate such devices, then they can be mounted in the dividing strip. If there is no one, then you can use the left part from the track, but only in cases if there is one strip of oncoming traffic, if there are two or more, then the installation is carried out above the track.